Home / Basement Finishing / Westminster
Westminster, CO · Home Base

Basement Finishing in Westminster, CO

This is the city we work from.

Saw Dog Construction finishes basements in Westminster, CO, and Westminster is where we are based. Our team designs the space, files the permit with the City of Westminster, builds it, and stays through the city's inspections. The work carries our 2-year workmanship warranty.

Two Generations of Houses

80s and 90s basements, and the newer ones still waiting.

Saw Dog Construction is based in Westminster, so the walkthrough is close to home. Neighborhoods such as Hyland Greens, Northpark and Westminster Hills were built in the 80s and 90s, and a lot of those basements were never finished. The structure, roof and foundation are already there, so the budget goes into the rooms.

Bradburn Village, Huntington Trails and Legacy Ridge are the newer end. Plenty of those houses still have an unfinished lower level. Different decade, same City of Westminster permit, same 2-year workmanship warranty. The Westminster page covers kitchens, baths and backyards. The basement-specific story for older houses is Finishing an 80s or 90s Basement in Westminster.

The Permit

One city hall, even when the county line runs through town.

Westminster spans Adams County and Jefferson County. Building permits for a house inside the city still run through the City of Westminster either way. We file that permit and schedule the inspections as part of the job. The project is not done until the city has inspected it.

On an 80s or 90s basement we walk the space before we promise a layout. Ceiling height, the mechanical layout and whatever rough-ins are already in the slab can change the scope. That shows up in the written estimate, before any work starts. If a bedroom is part of the plan, building codes generally require an emergency escape opening, and an egress window is the usual way to get there.

How the Finish Runs

Same four beats as every other basement we build.

  • Free walkthrough and a written estimate
  • Layout, finishes, and the City of Westminster permit
  • Framing through flooring, usually 6 to 10 weeks after approval
  • City inspection, a walkthrough, and the 2-year warranty

You can usually stay in the house. The mess stays downstairs, and we talk through access and the noisy days before we start.

Finished Rooms

A rec room and a basement bath.

A finished lower level with LVP, and a basement bath with a tub and shower surround.

Finished basement with luxury vinyl plank floors, gray walls, and a half wall
A basement Saw Dog finished with LVP floors and a half wall.
Basement bathroom with a one-piece tub and shower surround, vanity, and tile floor
A basement bathroom Saw Dog finished with a tub and shower surround.
What It Costs

The same planning numbers, with the older houses accounted for.

A full base finish averages about $80 per square foot. A bathroom adds $12,000 and up, and a from-scratch egress window is $7,000. On an older Westminster basement, ceiling height, the mechanical layout and the existing rough-ins can add scope. That belongs in the written estimate, not in a surprise later.

$80
per square foot for the base finish
$12,000+
for each basement bathroom
$7,000
for a from-scratch egress window

Size examples for 800, 1,000 and 1,200 square feet are on the basement finishing cost page on SawDog.net. These figures are planning numbers, not a quote. See basement finishing for the full scope we use across the metro.

Westminster Basement Questions

The questions we get on home turf.

Do you finish basements in Westminster, CO?
Yes. Saw Dog Construction is based in Westminster, CO. We finish basements in older neighborhoods such as Hyland Greens, Northpark and Westminster Hills, and in newer ones such as Bradburn Village, Huntington Trails and Legacy Ridge.
Who permits a basement finish in Westminster?
The City of Westminster. The city spans Adams County and Jefferson County, and building permits for homes inside the city run through the City of Westminster either way. We file the permit and schedule the inspections.
What should I expect on an 80s or 90s Westminster basement?
The structure, roof and foundation are already there, so the budget goes into the rooms. We walk the space first. Ceiling height, the mechanical layout and the existing rough-ins can change the scope, and the written estimate covers that before any work starts.
How long does a Westminster basement finish take, and is it warrantied?
A typical full finish takes 6 to 10 weeks after the City of Westminster approves the permit. The city's review time is separate from that schedule. The work carries a 2-year workmanship warranty, and the written terms come with the contract.
On SawDog.net

Keep reading.

Free Estimates

Let's talk about your Westminster basement.

📞
Call or textCall (720) 290-4077 · Text us
🕗
HoursMon-Fri 8am-6pm · Sat 8am-2pm · Closed Sunday
🛡️
Licensed and insuredResidential general contractor · ICC F13-certified · $1M liability coverage

Tell us what you have in mind. Share your project type, city, and a few details about the space. Our goal is to get back to you within 24 hours to discuss the next step. Fields marked * are required.

We only use your information to respond to your request. Privacy Policy